Subsector: Transit
Bus Rapid Transit
VMT Reduction Potential: 5
Cost: 5
ROI: 3
StanCOG Relevancy: 5
Land Use Content: Urban, Suburban
Trip Type: School, Residential, Commute, Recreation
Scale: Regional
Timing: Mid-term (3-10 years)
Implementors-Public: Municipalities, Regional Agencies, Transit Agencies
References: California Air Pollution Control Officers Association (2024), StanRTA Vision 2032, StanRTA Short Range Transit Plan/BRT Analysis, StanCOG Regional Transportation Plan

Description

Bus Rapid Transit (BRT) is a high-quality bus-based transit system that provides greater capacity and speed. It typically includes features like dedicated bus lanes, off-board fare collection, and signal priority to reduce delays and improve reliability.

Implementation Details

  • Complete StanRTA’s BRT feasibility and master-planning process and identify the highest-potential corridor based on ridership, population, employment, travel time, and development potential.
  • Evaluate major Modesto corridors for BRT or BRT-lite improvements, including transit signal priority, enhanced stops, frequent service, and limited stops.
  • Coordinate BRT planning with StanCOG’s RTP/SCS and local general plans to encourage transit-supportive development along the corridor.
  • Prioritize transit signal priority and queue-jump treatments where full dedicated lanes are not feasible.
  • Develop enhanced stations with shelters, real-time information, bicycle facilities, ADA accessibility, and improved pedestrian connections
  • Apply for grant funding and pursue RTP allocated funds for BRT Study implementation.

Mitigation Potential

Bus Rapid Transit can substantially reduce VMT by providing faster, more reliable, and more frequent transit service that is competitive with driving. Features such as transit priority treatments, enhanced stations, and reduced travel times can encourage transit use and shift trips away from single-occupancy vehicles.

For more details, see CAPCOA, T-28. Provide Bus Rapid Transit, pg. 197-203 for VMT reduction quantification. 

Linked Strategies

Equity Considerations

Transit expansion should prioritize areas with high concentrations of transit-dependent populations, including low-income residents, seniors, and essential workers. Late-night and weekend service is critical for shift workers. Equity goals should include minimizing headways in underserved areas and ensuring accessible transit for riders with disabilities through ADA-compliant infrastructure and real-time info tools.

Funding Sources

Requires significant capital and operating funding. Potential sources include the FTA Capital Investment Grants, Buses and Bus Facilities Program, Low or No Emission Vehicle Program, State Transportation Improvement Program, Transit and Intercity Rail Capital Program, CMAQ, and local transportation funding. StanCOG is already providing $700,000 in REAP 2.0 funding to StanRTA for implementation study and concept development for a new BRT service in Modesto, making this strategy particularly relevant to the StanCOG region.

Examples/Case Studies

San Joaquin RTD – BRT Express

San Joaquin RTD operates BRT Express corridors using higher-frequency service, limited stops, improved shelters and boarding areas, prepaid fare equipment, and connections at major transit centers. The system provides a particularly relevant peer example because it operates in a Central Valley region with similar suburban, agricultural, and urban development patterns.

Fresno Area Express – FAX Q  

FAX Q provides a strong Central Valley example of BRT implementation. The 15.7-mile route uses 10-minute peak frequencies, transit signal priority, enhanced stations, off-board fare collection, fewer stops, and real-time passenger information. The City reports that Q service is approximately 25% faster than traditional service and had more than 2.5 million riders during its first full year of operation.